Channel Avatar

Sulav Lohani @UCbl8zZTWlZ_shFhCXD4CTtg@youtube.com

0 subscribers - no pronouns :c

More from this channel (soon)


01:07
Missing CIVIL 3D option in Workspace | CIVIL 3D PROBLEM | BRING CIVIL 3D WORKSPACE BACK
01:34
Brave Browser (2024): How to Remove Vertical Tabs and Side Bars?
02:34
QGIS Tutorial: - Raster Resampling || Changing the pixel size as per required using QGIS
15:42
QGIS Tutorial : Method 2 & 3 || Calculating Topographic Wetness Index TWI
05:27
QGIS Tutorial: Method 1 for Calculating Topographic Wetness Index (TWI)
00:52
QGIS Tutorial - Roughness Calculation
09:38
Terrain Analysis in QGIS: SLOPE (in degrees and radians)| ASPECT | CURVATURE | Hill Shade | CONTOUR
23:55
Project:- Punyamata Catchment area || PRACTICE SESSION
19:24
Catchment Area of Punyamata River (Complete Video)
03:17
MS WORD: Make STYLES Universal | Copy styles from one document to another | EASIEST METHOD
04:06
(FIXED) QGIS Error : UPSLOPE AREA ERROR || Error tool needs graphical user interface Upslope Area
04:07
Set 2 Part 1 FISU Badminton NEPAL vs SLOVAKIA | SULAV LOHANI vs GREGOR ALIC | CHENGDU, CHINA
01:25
TRANSPORTATION ENGINEERING BASICS || A CIVIL ENGINEER FRESHER MUST KNOW
01:37
SURVEYING QUESTIONS AND ANSWERS || A CIVIL ENGINEER FRESHER MUST KNOW
01:37
ENGINEERING MECHANICS || A CIVIL ENGINEER FRESHER MUST KNOW
01:18
STRUCTURAL DESIGN AND DRAWING | A FRESHER MUST KNOW
01:32
BUILDING DESIGN, CONSTRUCTION MATERIAL AND DRAWING | FRESHER MUST KNOW
01:44
CONCRETE TECHNOLOGY BASICS || A FRESHER MUST KNOW
02:20
BASIC KNOWLEDGE A CIVIL ENGINEER || FRESHER MUST KNOW
00:09
CONVOCATION MEMORY | KATHMANDU UNIVERSITY | CIVIL BATCH 2018
04:50
ESTIMATION, COSTING AND VALUATION || NEPAL ENGINEERING COUNCIL
03:39
SURVEYING AND LEVELLING || NEPAL ENGINEERING COUNCIL LICENSE EXAM
06:23
Waste Water Engineering PART 2 || NEPAL ENGINEERING COUNCIL
06:03
WASTE WATER ENGINEERING PART 1 | NEPAL ENGINEERING COUNCIL LICENSE EXAM
01:19
Water Supply Engineering Part 8 License Exam || Nepal Engineering Council MCQ
03:10
Water Supply Engineering Part 7 License Exam || Nepal Engineering Council MCQ
02:42
Water Supply Engineering Part 6 License Exam || Nepal Engineering Council MCQ
02:41
Water Supply Engineering Part 5 License Exam || Nepal Engineering Council MCQ
02:23
Water Supply Engineering Part 4 License Exam || Nepal Engineering Council MCQ
03:24
Water supply Engineering Part 3 License Exam || Nepal Engineering Council MCQ
03:38
Water supply Engineering Part 2 (License Exam) | Nepal Engineering Council | MCQ
11:20
COMPLETE VIDEO: Nepal Engineering Council Registration
03:30
Water supply Engineering Part 1 (License Exam) | Nepal Engineering Council | MCQ
01:32
TOP 5 Best Websites for Engineering License Exam | NEPAL ENGINEERING COUNCIL LICENSE EXAM
01:53
NEPAL ENGINEERING LICENSE EXAM SYLLABUS | CIVIL FOR NEPAL
17:02
THE ACADEMIC TALK SHOW | KU LIFE EXPERIENCES SHARING PROGRAM | 1st Year to 4th Year Experiences
04:10
APPLY FOR CONVOCATION CERTIFICATE ONLINE | KATHMANDU UNIVERSITY
11:00
How to apply for TRANSCRIPT Online |Kathmandu University |Provisional,Migration,Character,PERCENTAGE
09:13
Building Construction STEP by STEP | CIVIL ENGINEERING VIDEO
04:52
Estimation and Ground Profile | CIVIL3D | BY SHEKHAR CHAULAGAIN
07:00
Correction in Comment | Estimation of support type | COST ESTIMATION IN TUNNEL | BY PIYUSH GAUTAM
29:51
Powerhouse analysis using ETABS
39:42
HRT PHASE ANALYSIS, PROJECT VIDEO
22:59
SURGE SHAFT CAVERN ANALYSIS USING PHASE 2
02:13
Import geometry to Phase 2 Software | Export from AUTOCAD | Tunnel Analysis using Phase 2 Software
01:44
AutoCAD Dynamic Input Settings | Move to 0,0 Coordinate ORIGIN
22:35
Selection and Design of Turbine, Generator and POWERHOUSE | By Bheshraj Joshi
13:31
CIVIL 3D AND HEC RAS NEW PROJECT | REVISION
21:58
STUDY MAP AREA FOR FINAL YEAR PROJECT | SIKJA 24.41 MW, USING LOCAL UNIT | SHAPE FILE OF NEPAL |QGIS
11:58
Civil 3d and HECRAS | CIVIL 3D Alignment | EXPORT TO HECRAS AND WORKING WITH HEC RAS
23:47
CIVIL3D & HECRAS | DETERMINE WATER LEVEL for Q40,50 yrs& 100 yrs time period | Kathmandu University
39:32
CIVIL 3D AND HEC RAS | FINAL YEAR PROJECT VIDEO | UNCUT 😂😂
07:57
Layout of Catchment Area in Layers | Print layout in qgis | Export as image using qgis
10:55
Catchment Area in layers using QGIS | Catchment Area in different areas | Layerwise Catchment Areaa
02:20
QGIS Basics: Working with DEM File Import dem, Reproject/Warp, Import KML, Clip dem
01:43
How to make Project Boundary POLYGON with Google Earth PRO
00:42
[FIXED] Ribbon does not have any tabs or panels currently loaded | CIVIL 3D PROBLEM
02:49
Convert daily data (Discharge) to monthly and annual data using excel | Text to Columns| Pivot Table
04:25
Arrange daily discharge data provided by DHM | EDUCATIONAL PURPOSE ONLY | Average | Maxm | Minm
26:26
FLASH MOB | UTSARGA 2079 | THAPATHALI CAMPUS